Waterloo, IA 16in Pipeline In-Line-Inspection Modifications Phase I & II

This project consisted of multiple modifications to an existing high pressure 16in natural gas line to properly run a smart pig.  PLE crews installed 4 – 16” x 20” pig launchers/receivers, 9 – 16” Main Line Valves, and 7 – 16” Tees over a 75 miles section of the pipeline.  This project utilized numerous line- stops throughout the construction process.  PLE utilized their skilled crews to complete all facets of the project which included the civil, mechanical, and electrical installations.