This project implemented the use of a jack and bore method to install 200’ of 16” casing and 8” carrier pipe under I-95, with an additional 400’ of 8” running parallel to the highway. The entry and exit pits, were 20 – 25’ deep, required the use of engineered approved shoring. PLE performed all excavation, welding, coating, pressure testing, and tree clearing. This job took place during a very large highway expansion project. PL-Enerserv worked closely with Maine DOT and other highway contractors to coordinate all lane closures, lane shifts, and signage to keep all operations running seamlessly.