Mullinville, KS – 24in Pipeline Emergency Installation

This project consisted of the emergency installation of a 24in pipeline via Conventional Bore beneath an existing Railroad Track.  The project consisted of a 130 LF Conventional Bore beneath an active Railroad Track with the requirement of a single 24-inch line stop.  Multiple hydro-excavation trucks were utilized due to the proximity of existing utilities.  The project was completed quickly to minimize the customer's outage.