This project consisted of the installation of approximately 2-miles of 12in 0.500wt pipeline with a new associated high-pressure meter/regulator station. This project consisted of 3 – HDD’s and several modifications to an existing station which consisted of numerous... by PL-Enerserv | Aug 29, 2024
This project consisted of the emergency installation of a 24in pipeline via Conventional Bore beneath an existing Railroad Track. The project consisted of a 130 LF Conventional Bore beneath an active Railroad Track with the requirement of a single 24-inch line stop. ... by PL-Enerserv | Aug 29, 2024
This project included the installation of a new 73,000 lb. filter separator, fabrication and pressure testing of 2”, 24” and 30” piping, valves, and drain/storage tank. PLE also fabricated and installed all platforms, railings, and stairs to ASME/ASTM standards. The... by PL-Enerserv | Aug 29, 2024
This project consisted of installing three new boilers, pumps, new electrical control panels, and replacing four 20” valves. PLE fabricated all fuel gas, bypass, glycol supply/return, and vent piping. PLE constructed all concrete pads and exhaust chimneys. PLE also... by PL-Enerserv | Aug 29, 2024
This project implemented the use of a jack and bore method to install 200’ of 16” casing and 8” carrier pipe under I-95, with an additional 400’ of 8” running parallel to the highway. The entry and exit pits, were 20 – 25’ deep, required the use of engineered approved...